|
Technical requirements:
The fabricating method of membrane housing should be in
accordance with JC692-1998;
The design pressure of membrane housing is 1000PSI and
the permitted scope of work temperature is £7¡æ~49¡æ
The leakage test of membrane housing adapts hydraulic
test. The test pressure is 1.2 times of the design pressure. |