|
Technical
requirements:
The fabricating method of membrane housing should be in accordance with
JC692-1998;
The design pressure of membrane housing is 1000PSI and the permitted scope
of work temperature is £7¡æ~49¡æ
The leakage test of membrane housing adapts hydraulic test. The test
pressure is 1.5 times of the design pressure. |